Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 436 SW GERALD CONNER DR LAKE CITY FL 32024
Parcel #: 03095-102
Acres: 0.51
Owner: Trent Giebeig Construction Inc
Subdivision: Cannon Creek Place
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 25518
Permit #: 000035347
Related Permit: Culvert: 000002422
Submitted: Wednesday, May 24, 2017
Issued: Wednesday, May 24, 2017
Expires: Thursday, September 28, 2017
Completed: Thursday, September 28, 2017
Status: Completed
Septic Release? No
Notes:
FLOOR ONE FOOT ABOVE THE ROAD NOC ON FILE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1600.00
Total Area (Sqft) 2277.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 17-0245-R
Power Company CLAY
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0293D
Review Notes
Contractors
Name/ Business License Title Role
Trent Giebeig

CRC1330693
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dm 5/26/2017
Underslab Rough Plumbing Inspection Troy Crews 5/31/2017
Setback Inspection Troy Crews 5/31/2017
Slab Inspection Randy Jones 6/2/2017
Monolithic Slab Inspection Randy Jones 6/2/2017
Monolithic Slab Inspection Randy Jones 6/2/2017
Sheathing and Nailing Inspection Randy Jones 6/27/2017
Sheathing and Nailing Inspection Randy Jones 6/27/2017
Rough-In Plumbing Inspection Troy Crews 7/20/2017
Electrical Rough-In Inspection Troy Crews 7/20/2017
Heat and Air Duct Inspection Troy Crews 7/20/2017
Framing Inspection Tommy Matthews 7/25/2017
Insulation Inspection Randy Jones 7/27/2017
Insulation Inspection Randy Jones 7/27/2017
Permanent Power Inspection Troy Crews 9/8/2017
Passed: Engineering - Final Driveway Dm 9/19/2017
Final Inspection Tommy Matthews 9/28/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 9/29/2017
Documents
File Name Date File Size
Permit-000035347.pdf 2023.12.21 444.75kB
Certificate Of Occupancy.pdf 2023.12.21 141.88kB
Permit-35347.pdf 2023.12.21 444.75kB