Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 311 NW CASTLEWOOD COURT LAKE CITY FL 32055
Parcel #: 01777-103
Acres: 5.01
Owner: David & Patricia Haffner
Subdivision: Suwannee Valley Farm
Zoning: A-3
Flood Zone: X
District: 1
Application #: 20947
Permit #: 000035029
Related Permit: Culvert: 000002385
Submitted: Friday, March 10, 2017
Issued: Friday, March 10, 2017
Expires: Wednesday, November 1, 2017
Completed: Wednesday, November 1, 2017
Status: Completed
Septic Release? No
Notes:
1 FOOT ABOVE ROAD.(ELEVATION CORRECTED) PER CONSTRUCTION PLANS NOC ON FILE - MINIMUM ELEVATION SET AT 103.00'. ELEVATION LETTER REC'D AT 105.25'
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2157.00
Total Area (Sqft) 3277.00
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 17-0104-N
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0186D
Review Notes
Contractors
Name/ Business License Title Role
Josh Sparks
Sparks Construction
CBC1252260 Building Contractor
Inspections
Inspection Notes Performed By Date
Underslab Rough Plumbing Inspection Troy Crews 4/6/2016
Foundation Inspection Randy Jones 3/20/2017
Setback Inspection Randy Jones 3/20/2017
Foundation Inspection Randy Jones 3/20/2017
Setback Inspection Randy Jones 3/20/2017
Passed: Engineering - Initial Driveway 3/20/2017
Slab Inspection Randy Jones 4/18/2017
Slab Inspection Randy Jones 4/18/2017
Temporary Power Inspection Randy Jones 5/18/2017
Temporary Power Inspection Randy Jones 5/18/2017
Sheathing and Nailing Inspection Troy Crews 5/22/2017
Insulation Inspection Troy Crews 6/26/2017
Permanent Power Inspection Tommy Matthews 9/15/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 11/1/2017
Final Inspection Troy Crews 11/1/2017
(Requested) Sheathing/Nailing-Roof & Wall
(Requested) Perm Power
(Requested) Final
Documents
File Name Date File Size
Permit-35029.pdf 2023.12.21 429.26kB
Certificate Of Occupancy.pdf 2023.12.21 141.09kB
Permit-000035029.pdf 2023.12.21 429.26kB