Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 415 SW MAYFAIR LN LAKE CITY FL 32024
Parcel #: 02911-332
Acres: 0.51
Owner: Trent Giebeig Construction Inc
Subdivision: Mayfair S/d
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 25482
Permit #: 000034764
Related Permit: Culvert: 000002357
Submitted: Tuesday, December 20, 2016
Issued: Tuesday, December 20, 2016
Expires: Thursday, March 30, 2017
Completed: Thursday, March 30, 2017
Status: Completed
Septic Release? No
Notes:
MINIMUM FLOOR ELEVATION @ 145.5' PER PLAT, NEED ELEVATION CONFIRMATION LETTER AT SLAB. ELEVATION LETTER REC'D NOC REC'D.
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1600.00
Total Area (Sqft) 2277.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 16-0686
Power Company CLAY
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Trent Giebeig

CRC1330693
Inspections
Inspection Notes Performed By Date
Foundation Inspection Troy Crews 12/21/2016
Setback Inspection Troy Crews 12/21/2016
Temporary Power Inspection Randy Jones 12/28/2016
Underslab Rough Plumbing Inspection Troy Crews 12/28/2016
Temporary Power Inspection Randy Jones 12/28/2016
Passed: Engineering - Initial Driveway Bs 12/28/2016
Slab Inspection Troy Crews 12/30/2016
Sheathing and Nailing Inspection Tommy Matthews 1/26/2017
Framing Inspection Troy Crews 2/9/2017
Rough-In Plumbing Inspection Troy Crews 2/9/2017
Electrical Rough-In Inspection Troy Crews 2/9/2017
Heat and Air Duct Inspection Troy Crews 2/9/2017
Insulation Inspection Troy Crews 2/13/2017
Permanent Power Inspection Troy Crews 3/22/2017
Passed: Engineering - Final Driveway Dm 3/27/2017
Final Inspection 3/30/2017
Final Inspection Tommy Matthews 3/30/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/30/2017
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.21 138.05kB