Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 1105 SW MANDIBA DR LAKE CITY FL 32024
Parcel #: 09280-137
Acres: 1.02
Owner: Leslie & Billie G.cruse
Subdivision: Oaks Of Lake City
Zoning: PRRD
Flood Zone: XPP
District: 5
Application #: 20871
Permit #: 000033472
Related Permit: Culvert: 000002235
Submitted: Tuesday, October 20, 2015
Issued: Tuesday, October 20, 2015
Expires: Tuesday, March 15, 2016
Completed: Tuesday, March 15, 2016
Status: Completed
Septic Release? No
Notes:
MFE @ 80.00' PER PLAT. ELEVATION LETTER @ SLAB..80.00' NOC ON FILE. ELEVATION LETTER REC'D @ 82.21' NAILING 12/9/15 TC
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0195D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 1161
Total Area (Sqft) 1874
Building Height 16
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 17-0387
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Homes, Inc.
CBC1257343 Building Contractor
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Troy Crews 10/22/2015
Foundation Inspection Troy Crews 10/22/2015
Setback Inspection Troy Crews 10/22/2015
Underslab Rough Plumbing Inspection Troy Crews 11/5/2015
Slab Inspection Troy Crews 11/12/2015
Sheeting and Nailing Inspection Troy Crews 12/2/2015
Sheathing and Nailing Inspection Troy Crews 12/2/2015
Framing Inspection Troy Crews 12/21/2015
Rough-In Plumbing Inspection Troy Crews 12/21/2015
Electrical Rough-In Inspection Troy Crews 12/21/2015
Heat and Air Duct Inspection Troy Crews 12/21/2015
Insulation Inspection Randy Jones 1/6/2016
Insulation Inspection Randy Jones 1/6/2016
Permanent Power Inspection Troy Crews 2/24/2016
Final Inspection Troy Crews 3/15/2016
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/16/2016
Documents
File Name Date File Size