Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 3101 SW CUSTOM MADE CR LAKE CITY FL 32024
Parcel #: 09280-106
Acres: 1.98
Owner: Chris & Donna Frazier
Subdivision: Oaks Of Lake City
Zoning: PRD
Flood Zone: XPP
District: 5
Application #: 20870
Permit #: 000033465
Related Permit: Culvert: 000002233
Submitted: Monday, October 19, 2015
Issued: Monday, October 19, 2015
Expires: Wednesday, April 20, 2016
Completed: Wednesday, April 20, 2016
Status: Completed
Septic Release? No
Notes:
MFE @ 88.00'..ELEVATION LETTER @ SLAB 88.00' PER PLAT. NOC ON FILE.ELEVATION CONFIRMATION REC'D @ 98.25'
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2327.00
Total Area (Sqft) 3224.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 15-0530
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0395C
Review Notes
Contractors
Name/ Business License Title Role
Blake Lunde, Ii.
Blake Construction Company Of North Florida Inc
CBC1253408 Building Contractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dd 10/20/2015
Setback Inspection Troy Crews 10/28/2015
Temporary Power Inspection Troy Crews 10/29/2015
Foundation Inspection Troy Crews 10/29/2015
Underslab Rough Plumbing Inspection Randy Jones 11/16/2015
Underslab Rough Plumbing Inspection Randy Jones 11/16/2015
Slab Inspection Tommy Matthews 11/19/2015
Rough-In Plumbing Inspection Troy Crews 1/12/2016
Electrical Rough-In Inspection Troy Crews 1/12/2016
Framing Inspection Troy Crews 1/20/2016
Heat and Air Duct Inspection Troy Crews 1/20/2016
Insulation Inspection Troy Crews 2/5/2016
Permanent Power Inspection Tommy Matthews 4/1/2016
Final Inspection Tommy Matthews 4/20/2016
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 4/25/2016
Passed: Engineering - Final Driveway Js 4/25/2016
(Requested) Slab
(Requested) Above slab Rough-in
(Requested) Electrical Rough-in
(Requested) Framing
(Requested) Heat & AC
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.21 141.88kB
Permit-33465.pdf 2023.12.21 731.97kB