Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 440 SW EMORYWOOD GLEN
LAKE CITY, FL 32024
Parcel #: 03397-107
Acres: 5.01
Owner: Dan Nickelson
Subdivision: Cove At Rose Creek
Zoning: A-3
Flood Zone: X PP
District:
Application #: 25125
Permit #: 000027521
Related Permit: Culvert Waiver: 000001695
Submitted: Monday, December 15, 2008
Issued: Monday, December 15, 2008
Expires: Friday, August 28, 2009
Completed: Friday, August 28, 2009
Status: Completed
Septic Release? No
Notes:
ELEVATION CONFIRMATION LETTER REQUIRED AT SLAB,MFE AT 80.5' NOC ON FILE, ELEVATION CONFIRMATION LETTER RECEIVED @ 90.25
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 3600.00
Total Area (Sqft) 6176.00
Stories 2
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors

This is an owner builder project.

Name/ Business License Title Role
Dan Nickelson

Inspections
Inspection Notes Performed By Date
Slab Inspection Randy Jones 1/7/2008
Slab Inspection Randy Jones 1/7/2008
Foundation Inspection Randy Jones 12/23/2008
Setback Inspection Randy Jones 12/23/2008
Foundation Inspection Randy Jones 12/23/2008
Underslab Rough Plumbing Inspection Randy Jones 1/6/2009
Underslab Rough Plumbing Inspection Randy Jones 1/6/2009
Sheeting and Nailing Inspection Harry Dicks 3/26/2009
Sheathing and Nailing Inspection Harry Dicks 3/26/2009
Framing Inspection Harry Dicks 4/28/2009
Rough-In Plumbing Inspection Harry Dicks 4/28/2009
Electrical Rough-In Inspection Harry Dicks 4/28/2009
Heat and Air Duct Inspection Harry Dicks 4/28/2009
Insulation Inspection Harry Dicks 5/1/2009
Permanent Power Inspection Harry Dicks 8/21/2009
Final Inspection Harry Dicks 8/28/2009
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 10/28/2009
Documents
File Name Date File Size
Documentation 20200723 040447.pdf 2023.12.21 47.33MB
Plans 2020-07-23 15.44.04.732.pdf 2023.12.21 10.37MB
Certificate Of Occupancy.pdf 2023.12.21 142.37kB