Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 252 SW MULBERRY DRIVE
LAKE CITY, FL 32055
Parcel #: 02856-128
Acres: 0.50
Owner: Maronda Homes
Subdivision: Timberlands
Zoning: RSF-2
Flood Zone: X PP
District:
Application #: 25123
Permit #: 000027518
Related Permit: Culvert: 000001693
Submitted: Thursday, December 11, 2008
Issued: Thursday, December 11, 2008
Expires: Friday, March 20, 2009
Completed: Friday, March 20, 2009
Status: Completed
Septic Release? No
Notes:
ELEVATION CONFIRMATION LETTER REQUIRED AT SLAB, MFE @ 91.0, NOC ON FILE, COMPACTION TEST RECEIVED
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 2024.00
Total Area (Sqft) 2406.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Theodore Brock
Maronda Homes Inc. Of Florida
County License & State License Expired.
CBC1256382 Cert Building
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Wayne Russ 12/31/2008
Underslab Rough Plumbing Inspection Wayne Russ 12/31/2008
Monolithic Slab Inspection Wayne Russ 1/5/2009
Setback Inspection Wayne Russ 1/5/2009
Perimeter Beam/Column Inspection Randy Jones 1/9/2009
Perimeter Beam/Column Inspection Randy Jones 1/9/2009
Sheeting and Nailing Inspection Harry Dicks 1/27/2009
Sheathing and Nailing Inspection Harry Dicks 1/27/2009
Framing Inspection Harry Dicks 2/3/2009
Rough-In Plumbing Inspection Harry Dicks 2/3/2009
Electrical Rough-In Inspection Harry Dicks 2/3/2009
Heat and Air Duct Inspection Harry Dicks 2/3/2009
Permanent Power Inspection Wayne Russ 3/10/2009
Final Inspection Wayne Russ 3/20/2009
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/23/2009
Documents
File Name Date File Size
Documentation 20200716 093647.pdf 2023.12.21 21.44MB
Certificate Of Occupancy.pdf 2023.12.21 143.16kB
Plans 2020-07-16 09.28.51.93.pdf 2023.12.21 20.65MB