Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 229 SW MELBA GLEN
LAKE CITY, FL 32025
Parcel #: 03113-156
Acres: 0.59
Owner: Hugo Escalante
Subdivision: Wise Estates
Zoning: RSF-2
Flood Zone: APP
District: 3
Application #: 24868
Permit #: 000025318
Related Permit: Culvert: 000001279
Submitted: Monday, December 18, 2006
Issued: Monday, December 18, 2006
Expires: Wednesday, November 14, 2007
Completed: Wednesday, November 14, 2007
Status: Completed
Septic Release? No
Notes:
NOC ON FILE, PLAT REQUIRES 1ST FLOOR TO BE AT 98.3 FEET, ELEVATION LETTER RECEIVED, FLOOR ELEVATION IS 99.52'
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 1888.00
Total Area (Sqft) 2716.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0381D
Review Notes
Contractors
Name/ Business License Title Role
Hugo Escalante(ewpl Inc)

CRC1326976
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Randy Jones 12/28/2006
Foundation Inspection Randy Jones 12/28/2006
Setback Inspection Randy Jones 12/28/2006
Temporary Power Inspection Randy Jones 12/28/2006
Underslab Rough Plumbing Inspection Randy Jones 1/12/2007
Underslab Rough Plumbing Inspection Randy Jones 1/12/2007
Slab Inspection John Kerce 1/18/2007
Sheeting and Nailing Inspection Harry Dicks 5/10/2007
Sheathing and Nailing Inspection Harry Dicks 5/10/2007
Rough-In Plumbing Inspection Randy Jones 5/24/2007
Electrical Rough-In Inspection Randy Jones 5/24/2007
Heat and Air Duct Inspection Randy Jones 5/24/2007
Rough-In Plumbing Inspection Randy Jones 5/24/2007
Framing Inspection Randy Jones 6/4/2007
Framing Inspection Randy Jones 6/4/2007
Permanent Power Inspection Randy Jones 8/16/2007
Permanent Power Inspection Randy Jones 8/16/2007
Final Inspection Wayne Russ 11/14/2007
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 11/14/2007
Documents
File Name Date File Size
Application Packet 2020-01-17 3.23.00 Pm.pdf 2023.12.21 5.63MB
Certificate Of Occupancy.pdf 2023.12.21 143.16kB
Plans 2020-01-23 14.20.01.78.pdf 2023.12.21 5.91MB