Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 479 SW HILL CREEK DRIVE
LAKE CITY, FL 32025
Parcel #: 09116-133
Acres: 1.89
Owner: James A. Beach
Subdivision: Hills @ Rose Creek
Zoning: PRRD
Flood Zone: XPP
District:
Application #: 29162
Permit #: 000024254
Related Permit:
Submitted: Friday, March 17, 2006
Issued: Friday, March 17, 2006
Expires: Monday, December 18, 2006
Completed: Monday, December 18, 2006
Status: Completed
Septic Release? No
Notes:
1 FOOT ABOVE ROAD. CULVERT APPLICATION PAID FOR IN 01.09.2006. NOC ON FILE. SLAB,RJ,5-26-06
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2484.00
Total Area (Sqft) 3481.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors

This is an owner builder project.

Name/ Business License Title Role
James A. Beach

Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Randy Jones 4/5/2006
Temporary Power Inspection Randy Jones 4/5/2006
Foundation Inspection Randy Jones 4/12/2006
Setback Inspection Randy Jones 4/12/2006
Foundation Inspection Randy Jones 4/12/2006
Underslab Rough Plumbing Inspection Randy Jones 4/26/2006
Underslab Rough Plumbing Inspection Randy Jones 4/26/2006
Perimeter Beam/Column Inspection Randy Jones 5/16/2006
Perimeter Beam/Column Inspection Randy Jones 5/16/2006
Slab Inspection Randy Jones 5/26/2006
Slab Inspection Randy Jones 5/26/2006
Rough-In Plumbing Inspection Randy Jones 8/1/2006
Electrical Rough-In Inspection Randy Jones 8/1/2006
Heat and Air Duct Inspection Randy Jones 8/1/2006
Rough-In Plumbing Inspection Randy Jones 8/1/2006
Framing Inspection Randy Jones 8/14/2006
Framing Inspection Randy Jones 8/14/2006
Permanent Power Inspection John Kerce 11/29/2006
Final Inspection Harry Dicks 12/18/2006
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 12/18/2006