Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 14767 N US HWY 441 LAKE CITY FL 32055
Parcel #: 04507-001
Acres: 25.00
Owner: H. Michael Thomas
Subdivision:
Zoning: A-1
Flood Zone: X
District: 1
Application #: 29141
Permit #: 000023977
Related Permit:
Submitted: Tuesday, December 20, 2005
Issued: Tuesday, December 20, 2005
Expires: Sunday, June 18, 2006
Completed:
Status:
Septic Release? No
Notes:
NOC ON FILE. ONE FOOT ABOVE ROAD.
Job Details
Finished floor requirement
Fema map number 12023C0092C
This is the construction of a SFD/UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 1650.00
Total Area (Sqft) 2256.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Owner-builder

Inspections
Inspection Notes Performed By Date
Foundation Inspection Randy Jones 12/30/2005
Setback Inspection Randy Jones 12/30/2005
Foundation Inspection Randy Jones 12/30/2005
Temporary Power Inspection Randy Jones 1/13/2006
Temporary Power Inspection Randy Jones 1/13/2006
Sheeting and Nailing Inspection Randy Jones 1/20/2006
Sheathing and Nailing Inspection Randy Jones 1/20/2006
Sheathing and Nailing Inspection Randy Jones 1/20/2006
Electrical Rough-In Inspection Randy Jones 5/24/2006
Heat and Air Duct Inspection Randy Jones 5/24/2006
Electrical Rough-In Inspection Randy Jones 5/24/2006
Framing Inspection Randy Jones 6/14/2006
Rough-In Plumbing Inspection Randy Jones 6/14/2006
Framing Inspection Randy Jones 6/14/2006
Permanent Power Inspection John Kerce 12/1/2006
Documents
File Name Date File Size
Big Plans 004.pdf 2025.06.19 762.55kB
Big Plans 001.pdf 2025.06.19 851.79kB
Big Plans 003.pdf 2025.06.19 879.54kB
Big Plans 005.pdf 2025.06.19 879.19kB
Big Plans 002.pdf 2025.06.19 1.05MB
Documentation 20240327 092448.pdf 2025.06.19 11.21MB