Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 172 SW TIMBERLAND COURT LAKE CITY FL 32055
Parcel #: 02438-195
Acres: 0.50
Owner: Cornerstone Developers
Subdivision: Emerald Cove
Zoning: RSF-2
Flood Zone: X PP
District: 3
Application #: 27752
Permit #: 000023911
Related Permit: Culvert: 000000900
Submitted: Wednesday, November 30, 2005
Issued: Wednesday, November 30, 2005
Expires: Wednesday, July 19, 2006
Completed: Wednesday, July 19, 2006
Status: Completed
Septic Release? No
Notes:
FLOOR HEIGHT LETTER IN FILE, NOC ON FILE ALTERNATE TERMIT TREATMENT RECEIVED
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 1430.00
Total Area (Sqft) 1867.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction, Inc.
CBC054575 Cert.building Contractor
Inspections
Inspection Notes Performed By Date
Setback Inspection Harry Dicks 1/5/2006
Underslab Rough Plumbing Inspection Harry Dicks 3/14/2006
Slab Inspection Randy Jones 3/23/2006
Slab Inspection Randy Jones 3/23/2006
Sheeting and Nailing Inspection Randy Jones 4/19/2006
Sheathing and Nailing Inspection Randy Jones 4/19/2006
Sheathing and Nailing Inspection Randy Jones 4/19/2006
Framing Inspection Randy Jones 5/3/2006
Rough-In Plumbing Inspection Randy Jones 5/3/2006
Electrical Rough-In Inspection Randy Jones 5/3/2006
Heat and Air Duct Inspection Randy Jones 5/3/2006
Framing Inspection Randy Jones 5/3/2006
Permanent Power Inspection Harry Dicks 7/11/2006
Final Inspection Harry Dicks 7/19/2006
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 7/19/2006
Documents
File Name Date File Size
Documentation 20240223 094546.pdf 2024.02.23 348.77kB
Documentation 20240223 094458.pdf 2024.02.23 26.09MB
Big Plans 002.pdf 2024.02.22 11.42MB
Big Plans 003.pdf 2024.02.22 21.34MB
Big Plans 004 (99).pdf 2024.02.22 9.64MB
Big Plans 001.pdf 2024.02.22 19.51MB
Certificate Of Occupancy.pdf 2023.12.21 142.39kB