Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 276 SE GREGORY GLEN LAKE CITY FL 32025
Parcel #: 08359-126
Acres: 0.51
Owner: Cornerstone Development Group
Subdivision: Country Side Estates
Zoning: RSF-2
Flood Zone: X
District: 4
Application #: 27743
Permit #: 000023853
Related Permit: Culvert: 000000886
Submitted: Wednesday, November 16, 2005
Issued: Wednesday, November 16, 2005
Expires: Friday, March 17, 2006
Completed: Friday, March 17, 2006
Status: Completed
Septic Release? No
Notes:
ONE FOOT ABOVE THE ROAD, NOC ON FILE ALTERNATE TERMIT TREATMENT RECEIVED, COMPACTION TEST RECEIVED NAILING,1-9-06,RJ
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 1500.00
Total Area (Sqft) 1974.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0313D
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction, Inc.
CBC054575 Cert.building Contractor
Inspections
Inspection Notes Performed By Date
Underslab Rough Plumbing Inspection Randy Jones 11/21/2005
Underslab Rough Plumbing Inspection Randy Jones 11/21/2005
Monolithic Slab Inspection Harry Dicks 11/30/2005
Setback Inspection Harry Dicks 11/30/2005
Sheeting and Nailing Inspection Harry Dicks 1/13/2006
Sheathing and Nailing Inspection Harry Dicks 1/13/2006
Framing Inspection Randy Jones 1/25/2006
Rough-In Plumbing Inspection Randy Jones 1/25/2006
Electrical Rough-In Inspection Randy Jones 1/25/2006
Heat and Air Duct Inspection Randy Jones 1/25/2006
Framing Inspection Randy Jones 1/25/2006
Permanent Power Inspection Harry Dicks 3/6/2006
Final Inspection Harry Dicks 3/17/2006
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/17/2006
Documents
File Name Date File Size
Big Plans 002.pdf 2024.02.14 10.60MB
Big Plans 003 (88).pdf 2024.02.14 21.55MB
Big Plans 004 (79).pdf 2024.02.14 7.87MB
Big Plans 001.pdf 2024.02.14 15.26MB
Documentation 20240214 084747.pdf 2024.02.14 22.25MB
Documentation 20240214 084506.pdf 2024.02.14 19.56MB
Certificate Of Occupancy.pdf 2023.12.21 142.39kB