Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 176 SW PHILLIPS CIRCLE LAKE CITY FL 32024
Parcel #: 02739-234
Acres: 0.50
Owner: Earl Savage
Subdivision: Turkey Run
Zoning: RSF-2
Flood Zone: XPP
District: 3
Application #: 29127
Permit #: 000023846
Related Permit: Culvert: 000000885
Submitted: Monday, November 14, 2005
Issued: Monday, November 14, 2005
Expires: Wednesday, May 31, 2006
Completed: Wednesday, May 31, 2006
Status: Completed
Septic Release? No
Notes:
NOC ON FILE 1 FOOT ABOVE RD.
Job Details
Finished floor requirement
Fema map number 12023C0290D
This is the construction of a SFD/UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 1
Heated Area (Sqft) 1738.00
Total Area (Sqft) 2559.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
William G. Wood

CBC058182
Inspections
Inspection Notes Performed By Date
Foundation Inspection John Kerce 12/1/2005
Setback Inspection John Kerce 12/1/2005
Underslab Rough Plumbing Inspection Randy Jones 12/21/2005
Underslab Rough Plumbing Inspection Randy Jones 12/21/2005
Slab Inspection Randy Jones 1/4/2006
Slab Inspection Randy Jones 1/4/2006
Temporary Power Inspection Harry Dicks 1/30/2006
Sheeting and Nailing Inspection Randy Jones 2/20/2006
Sheathing and Nailing Inspection Randy Jones 2/20/2006
Sheathing and Nailing Inspection Randy Jones 2/20/2006
Framing Inspection Harry Dicks 3/14/2006
Rough-In Plumbing Inspection Harry Dicks 3/14/2006
Electrical Rough-In Inspection Harry Dicks 3/14/2006
Heat and Air Duct Inspection Harry Dicks 3/14/2006
Permanent Power Inspection Harry Dicks 5/17/2006
Final Inspection Harry Dicks 5/31/2006
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 5/31/2006
Documents
File Name Date File Size
Big Plans 003 (86).pdf 2025.07.04 775.31kB
Big Plans 006 (56).pdf 2025.07.04 755.70kB
Big Plans 005 (70).pdf 2025.07.04 835.01kB
Big Plans 002 (99).pdf 2025.07.04 859.53kB
Big Plans 004 (77).pdf 2025.07.04 1.52MB
Big Plans 001.pdf 2025.06.19 1.43MB
Documentation 20240213 025148.pdf 2025.06.18 19.23MB
Certificate Of Occupancy.pdf 2020.04.14 142.38kB