Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 239 SW LANCELOT GLEN LAKE CITY FL 32025
Parcel #: 03099-219
Acres: 1.61
Owner: Troy Hollingsworth
Subdivision: Stonehenge
Zoning: RSF-2
Flood Zone: XPP
District: 3
Application #: 29121
Permit #: 000023772
Related Permit: Culvert: 000000865
Submitted: Tuesday, October 25, 2005
Issued: Tuesday, October 25, 2005
Expires: Thursday, June 15, 2006
Completed: Thursday, June 15, 2006
Status: Completed
Septic Release? No
Notes:
NOC ON FILE. SEE ENGINEER LETTER. MINIMUM FINISHED FLOOR ELEVATION IS TO BE HIGHER OF 12 ABOVE HIGHEST ADJ. EXISTING GROUND ELEVATION OR 18 ABOVE EAST END OF PAVEMENT ADJ. TO RETENTION POND.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2317.00
Total Area (Sqft) 3082.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0293D
Review Notes
Contractors
Name/ Business License Title Role
Donald E. Williams
Donny Williams Construction, Llc
County License & State License & Liability Insurance & Workers Comp Expired.
CGC004692 General Contractor
Inspections
Inspection Notes Performed By Date
Foundation Inspection Harry Dicks 11/16/2005
Setback Inspection Harry Dicks 11/16/2005
Temporary Power Inspection Harry Dicks 12/7/2005
Underslab Rough Plumbing Inspection Harry Dicks 12/7/2005
Slab Inspection Harry Dicks 12/13/2005
Framing Inspection Randy Jones 3/15/2006
Rough-In Plumbing Inspection Randy Jones 3/15/2006
Electrical Rough-In Inspection Randy Jones 3/15/2006
Heat and Air Duct Inspection Randy Jones 3/15/2006
Framing Inspection Randy Jones 3/15/2006
Permanent Power Inspection Randy Jones 6/7/2006
Permanent Power Inspection Randy Jones 6/7/2006
Final Inspection Randy Jones 6/15/2006
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 6/15/2006
Final Inspection Randy Jones 6/15/2006
Documents
File Name Date File Size
Big Plans 002 (70).pdf 2024.01.17 35.33MB
Big Plans 003 (57).pdf 2024.01.17 33.00MB
Big Plans 004 (48).pdf 2024.01.17 32.34MB
Big Plans 005 (46).pdf 2024.01.17 20.14MB
Big Plans 001.pdf 2024.01.17 33.21MB
Documentation 20240117 123347.pdf 2024.01.17 26.33MB
Certificate Of Occupancy.pdf 2023.12.26 144.86kB