Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 557 NW BRIDGEWATER TERRACE LAKE CITY FL 32055
Parcel #: 02275-112
Acres: 1.80
Owner: Alex & Betty Hinely
Subdivision: Cobblestone
Zoning: RSF-2
Flood Zone: XPP
District: 1
Application #: 28813
Permit #: 000023117
Related Permit: Culvert: 000000654
Submitted: Friday, October 6, 2017
Issued:
Expires: Monday, October 31, 2005
Completed: Monday, October 31, 2005
Status: Completed
Septic Release? No
Notes:
NOC ON FILE 1 FOOT ABOVE ROAD.
Job Details
This is the construction of a SFD & UTILITY
Heated Area (Sqft) 2181.00
Total Area (Sqft) 3797.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0283D
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction, Inc.
CBC054575 Cert.building Contractor
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Randy Jones 5/11/2005
Foundation Inspection Randy Jones 5/11/2005
Setback Inspection Randy Jones 5/11/2005
Temporary Power Inspection Randy Jones 5/11/2005
Temporary Power Inspection Rj 5/11/2005
Underslab Rough Plumbing Inspection Harry Dicks 5/23/2005
Underslab Rough Plumbing Inspection Hd 5/23/2005
Slab Inspection Randy Jones 5/26/2005
Slab Inspection Randy Jones 5/26/2005
Slab Inspection Rj 5/26/2005
Framing Inspection Randy Jones 7/1/2005
Rough-In Plumbing Inspection Randy Jones 7/1/2005
Electrical Rough-In Inspection Randy Jones 7/1/2005
Heat and Air Duct Inspection Randy Jones 7/1/2005
Sheeting and Nailing Inspection Randy Jones 7/1/2005
Sheathing and Nailing Inspection Randy Jones 7/1/2005
Framing Inspection Randy Jones 7/1/2005
Framing Inspection Rj 7/1/2005
Final Inspection Harry Dicks 10/31/2005
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 10/31/2005
Final Inspection Hd 10/31/2005
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.26 142.39kB
Documentation 20231115 115147.pdf 2023.12.26 5.97MB