Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 240 SW CHINCHILLA GLEN HIGH SPRINGS FL 32643
Parcel #: 10042-015
Acres: 0.60
Owner: Marie Luango
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 28740
Permit #: 000022344
Related Permit:
Submitted: Wednesday, September 29, 2004
Issued: Wednesday, September 29, 2004
Expires: Friday, February 11, 2005
Completed: Friday, February 11, 2005
Status: Completed
Septic Release? No
Notes:
NOC ON FILE 1 FOOT ABOE ROAD. SPECIAL FAMILY LOT. NAILING,HD, 11-1704
Job Details
Finished floor requirement
Fema map number 12023C0551C
This is the construction of a SFD & UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 1480.00
Total Area (Sqft) 1902.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Ronald Clark
8ronald Clark Construction Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CRC1326560 Cert Residential
Inspections
Inspection Notes Performed By Date
Foundation Inspection Harry Dicks 10/6/2004
Setback Inspection Harry Dicks 10/6/2004
Underslab Rough Plumbing Inspection Richard Keen 10/13/2004
Slab Inspection Randy Jones 10/15/2004
Slab Inspection Randy Jones 10/15/2004
Temporary Power Inspection Richard Keen 11/1/2004
Framing Inspection Randy Jones 12/16/2004
Rough-In Plumbing Inspection Randy Jones 12/16/2004
Electrical Rough-In Inspection Randy Jones 12/16/2004
Heat and Air Duct Inspection Randy Jones 12/16/2004
Framing Inspection Randy Jones 12/16/2004
Permanent Power Inspection Harry Dicks 2/1/2005
Final Inspection Richard Keen 2/11/2005
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 2/14/2005
Documents
File Name Date File Size
Documentation 20210728 030946.pdf 2025.07.04 4.43MB
Certificate Of Occupancy.pdf 2020.04.14 169.14kB