Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Remodel Permit

Address SAME SAME FL SAME
Parcel #: 03365-000
Acres: 4.70
Owner: Gabriel Curry
Subdivision: Southwood Acres
Zoning: A-3
Flood Zone: OUT
District: 5
Application #: 14507
Permit #: 000020496
Related Permit:
Submitted: Tuesday, March 11, 2003
Issued: Tuesday, March 11, 2003
Expires: Sunday, September 7, 2003
Completed:
Status:
Septic Release? Yes
Notes:
CASH REC'D. NOC ON FILE.
Job Details
Finished floor requirement
Fema map number 12023C0430C
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Commercial
Roof Area (for this job) Sq Ft 1200
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? Metal layover
Type of New Roofing Product Metal
Florida Product Approval Number Fl-17992.1 R2
Product Manufacturer Capital Metal Supply, Inc.
Product Description 26 gauge gavalume
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Metal Overlay
Ventilation: Unvented
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
Contractors
Name/ Business License Title Role
Gabriel Curry

OWNER
Inspections
Inspection Notes Performed By Date
Slab Inspection Richard Keen 4/4/2003
Framing Inspection Richard Keen 5/2/2003
Rough-In Plumbing Inspection Richard Keen 5/2/2003
Electrical Rough-In Inspection Richard Keen 5/2/2003
Heat and Air Duct Inspection Richard Keen 5/2/2003
Permanent Power Inspection Randy Jones 7/18/2003
Permanent Power Inspection Randy Jones 7/18/2003
Documents
File Name Date File Size