Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
3/10/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/10/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Only Remainder Of Water Overhead ? |
Troy Crews |
4/12/2021 |
Passed: Building - Slab |
|
Troy Crews |
4/21/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
5/27/2021 |
Passed: Building - Wall Sheathing |
Do Not Cover Post Until Strapping Inspected, No Further Inspections Until Elevation Certified |
Troy Crews |
5/27/2021 |
Failed: Building - Framing |
To1 Truss Has 3336 Uplift Midspan Missing Screws Or Strapping |
Matt Forsyth |
6/23/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
6/23/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
6/23/2021 |
Passed: Building - Framing |
|
Matt Forsyth |
7/21/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
7/21/2021 |
Failed: Mechanical - Rough In |
Dryer Duct Shall Have No Screws. Dryer Duct Cannot Be Installed With Deformation.m1502.4.2 |
Matt Forsyth |
7/21/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Nail Plates Needed For Water Line At Top Of Wall In Two Places |
Matt Forsyth |
7/21/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
7/21/2021 |
Failed: Building - Insulation |
Enclosed Garage Not On Plans Need Revision, Also Not Insulated And Has Ac Ducts, Do Not Sheetrock Garage Until Changes Approved And Insulated |
Troy Crews |
7/29/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
10/13/2021 |
Release to power company |
|
Troy Crews |
10/13/2021 |
Failed: Building - Final |
Water Heater Needs To Be Wired, Open Ducts In Garage Not Properly Sealed For Conditioned Space, Need Blower Door Test. |
Troy Crews |
1/11/2022 |
Certificate-Release Certificate |
|
Troy Crews |
1/12/2022 |
Passed: Building - Final |
Need Blower Door Test |
Troy Crews |
1/12/2022 |