Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 2405 SW BRIM ST
LAKE CITY, FL 32024
Parcel #: 00344-011
Acres: 4.01
Owner: Rowland Joel & Melissa Rowland
Subdivision: Godbold Acres
Zoning: A-3
Flood Zone: X
District: 2
Application #: 48184
Permit #: 000041269
Related Permit:
Submitted:
Issued: Friday, February 5, 2021
Expires: Monday, August 30, 2021
Completed: Monday, August 30, 2021
Status: Completed
Septic Release? Yes
Notes:
DOUBLEWIDE HAS ALREADY BEEN REMOVED, SINGLE WIDE WILL BE REMOVED AFTER NEW CONSTRUCTION IS COMPLETE
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1575
Total Area (Sqft) 1775
Stories 1
Building Height 19
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Septic# (00-0000) or (X00-000) 21-0063
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0270C
In floodway N
Review Notes
1/15/2021 Point Review - Received-Hard Copy Application
2/1/2021 Plan Review - Reviewed STAFF-FYI: - AN EMAIL WAS SENT TO ROSENBOOM... 1.15.21 * 1.27.21 JIM BROWN SIGNATURE ROOFING - WORKERS' COMP
2/4/2021 Zoning Review - Reviewed STAFF-FYI: - AN EMAIL WAS SENT TO ROSENBOOM... 1.15.21 * 1.27.21 JIM BROWN SIGNATURE ROOFING - WORKERS' COMP - REC'D.
2/4/2021 Final Review - Payment Needed STAFF-FYI: - AN EMAIL WAS SENT TO ROSENBOOM... 1.15.21 * 1.27.21 JIM BROWN SIGNATURE ROOFING - WORKERS' COMP - REC'D. INSPECTOR TO VERIFY THAT ONLY ONE MOBILE HOME EXISTS ON SUBJECT PROPERTY AND SHALL BE REMOVED UPON CERTIFICATE OF OCCUPANCY
2/5/2021 Permit Issued Permit #000041269 created and approved.
Contractors
Name/ Business License Title Role
Scott Rosenboom
Rosenboom Inc
Liability Insurance & Workers Comp Expired.
CBC1257076 Cert Building Contractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
James Brown
Jim Brown Signature Roofing Inc
Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CCC1326144 Roofing Contractor Subcontractor
Marion Van Mersbergen
Plumbing Concepts Inc
Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1427326 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 3/2/2021
Passed: Engineering - Setbacks Matt Forsyth 3/2/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 3/24/2021
Failed: Building - Slab Need Wwmesh And Mesh Ups Rebar Pinched Against Plastic Need Clearance Matt Forsyth 4/7/2021
Passed: Building - Slab Matt Forsyth 4/8/2021
Passed: Building - Roof Decking Matt Forsyth 4/26/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 6/2/2021
Passed: Building - Strapping Troy Crews 6/2/2021
Cancelled: Building - Wall Sheathing Troy Crews 6/2/2021
Passed: Electrical - 2nd Rough-In Troy Crews 6/2/2021
Passed: Mechanical - Rough In Troy Crews 6/2/2021
Passed: Building - Framing Troy Crews 6/2/2021
Passed: Building - Insulation Walls And Vaulted Ceiling Matt Forsyth 6/9/2021
Passed: Electrical - Permanent Power Need Septic Released To Release Power Matt Forsyth 7/12/2021
Release to power company Melissa Garber 7/13/2021
Septic Release Inspection Health Dept 7/13/2021
Rescheduled 8/30/2021:Building - Final Matt Forsyth 8/26/2021
Passed: Building - Final Matt Forsyth 8/30/2021