Permit Details

Permit Search

Permit

Roof Replacement or Repair

569 NW FAIRWAY DR
LAKE CITY, FL 32055

Permit #
000056519
Application #
78800
Status Completed
  1. Submitted Sep 3, 2026
  2. Issued Sep 4, 2026
  3. Expires Apr 10, 2027
  4. Completed Oct 12, 2026

Property

Parcel #
02309-014
Owner
Patel Punita,
Acres
0.61
Subdivision
Fairway View Unit 1
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0280D
Type Roofing Job
Overlay with Metal
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2456
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
metal over shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL17992.1R4
Product Manufacturer
capital
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Permit Issued

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Sep 18, 2026

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  2. Oct 12, 2026

    Passed: Re-Roof - Roof Affidavit Review

    Approved

    Inspected by Troy Crews

  3. Oct 12, 2026

    Passed: Re-Roof - Roof Pictures Review

    Approved

    Inspected by Troy Crews

  4. Oct 12, 2026

    Passed: Re-Roof - Final

    Inspected by Troy Crews