Permit Details

Permit Search

Permit

Storage Building

431 SE MYRTIS RD
LAKE CITY, FL 32025

Permit #
000056336
Application #
76982
Status Septic Approval Paperwork was not accepted.
  1. Submitted Aug 14, 2026
  2. Issued Aug 14, 2026
  3. Expires Apr 5, 2027
  4. Completed —

Property

Parcel #
09186-006
Owner
Adams Kevin, Adams Christina
Acres
17.65
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Septic Approval Paperwork was not accepted.
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Fema map number
12023C0403C
Type of Structure
Storage Building
Commercial or Residential?
Residential
Septic# (00-0000) or (X00-000)
X26-103
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
10' (ACCESSORY)
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
NON-HABITABLE STRUCTURE
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Length
40'
Building Width
20'
Slab
New
Mechanical
No
Electrical
No
Plumbing
No

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Metal Building Plans was not accepted.
  4. Application Status Update Notification
  5. Septic Approval Paperwork was not accepted.
  6. Septic Approval Paperwork was not accepted.
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Submitted by building department on applicant's behalf
  11. Permit Issued
  12. Septic Approval Paperwork was not accepted.

Contractors

This is an owner-builder project.

  1. Aug 6, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 6, 2026

    Cancelled: Building - Monolithic Slab

    Cancel Due To The Rain

    Inspected by Nanderson

  3. Oct 6, 2026

    Cancelled: Engineering - Setbacks

    Cancel Due To The Rain

    Inspected by Nanderson

  4. Oct 7, 2026

    Passed: Building - Monolithic Slab

    12 Inch By 12 Inch Mono Slab

    Inspected by Troy Crews

  5. Oct 7, 2026

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Oct 9, 2026

    Cancelled: Building - Monolithic Slab

    Already Done

    Inspected by Tcrews

  7. Oct 9, 2026

    Cancelled: Engineering - Setbacks

    Already Done

    Inspected by Tcrews