Permit Details

Permit Search

Permit

Mobile Home

848 SW FAULKNER DR
FORT WHITE, FL 32038

Permit #
000056254
Application #
77022
Status Completed
  1. Submitted Jul 30, 2026
  2. Issued Aug 4, 2026
  3. Expires Apr 6, 2027
  4. Completed Oct 9, 2026

Property

Parcel #
03744-301
Owner
Mustonen Christopher Paul, Mustonen Jennifer Leigh
Acres
14.95
Subdivision
Pine Acres Unr
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0370C
Mobile Home is a:
Double Wide
Year Built
2027
Width (Ft.In)
32
Length (Ft.In)
48
Driveway access to home:
Existing Drive
Installation Decal #
130349
Septic #
26-0568
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
JAC FL 002628AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Subcontractor Form was not accepted.
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Submitted by building department on applicant's behalf
  8. Application Status Update Notification
  9. Permit Issued

Contractors

  • Rusty L Knowles

    Floridas Finest Mobile Home Set Up

    License
    IH1038219
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Jul 30, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 6, 2026

    Failed: Mobile Home - Mobile Home Set-Up Final

    Bonding Wire Missing, Pier Block Loose Rain Has Eroded Soil Around Base

    Inspected by Matt Forsyth

  3. Oct 6, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Oct 8, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    Items Corrected - Old Home Removed

    Inspected by Troy Crews

  5. Oct 8, 2026

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Oct 13, 2026

    Release to power company

    Inspected by Ewilliams