Permit Details

Permit Search

Permit

Mobile Home

251 NW IVY GLN
LAKE CITY, FL 32055

Permit #
000056105
Application #
76911
Status Completed
  1. Submitted Jul 14, 2026
  2. Issued Jul 16, 2026
  3. Expires Mar 21, 2027
  4. Completed Sep 23, 2026

Property

Parcel #
04843-049
Owner
Hebo, Llc,
Acres
1.81
Subdivision
Carter Place Unr
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0195D
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
28
Length (Ft.In)
68
Driveway access to home:
D.O.T. Permit
Installation Decal #
130479
Septic #
26-0518
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
CAV290GA26-15400AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
4
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. New address issued and ticket completed.
  4. Submitted by building department on applicant's behalf
  5. Permit Issued

Contractors

  • Daniel Hall

    Halls Transport

    License
    IH1144605
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Sep 3, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 22, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    All Requirements Met To Release Co-- 9.23.26 Mg

    Inspected by Christian Allen

  3. Sep 22, 2026

    Release to power company

    Inspected by Christian Allen

  4. Sep 22, 2026

    Passed: Engineering - Setbacks

    Inspected by Christian Allen

  5. Sep 22, 2026

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  6. Sep 23, 2026

    Cancelled: Engineering - D.O.T Final Driveway

    Inspected by Mgarber