Permit Details

Permit Search

Permit

New Residential Construction

805 SW BISHOP AVE
LAKE CITY, FL 32024

Permit #
000056043
Application #
75861
Status Permit Issued
  1. Submitted Jul 1, 2026
  2. Issued Jul 7, 2026
  3. Expires Jul 7, 2027
  4. Completed —

Property

Parcel #
03283-003
Owner
Pettyjohn Pamela,
Acres
20.39
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Permit Issued
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0380C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1491
Total Area (Sqft)
2268
Building Height
22.3
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
26-0432
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
198

Status & Review History

  1. Application pending.
  2. Application is within the City of Lake City service area
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Architectural Plans was not accepted.
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Application Status Update Notification
  16. Application Status Update Notification
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. Application Status Update Notification
  20. Application Status Update Notification
  21. Application Status Update Notification
  22. Application Status Update Notification
  23. Structural Engineering and Wind Load Calculations was not accepted.
  24. Proposed Site Plan was not accepted.
  25. Proposed Site Plan was not accepted.
  26. Application Status Update Notification
  27. Architectural Plans was not accepted.
  28. Structural Engineering and Wind Load Calculations was not accepted.
  29. Application Status Update Notification
  30. Application Status Update Notification
  31. Application Status Update Notification
  32. Application Status Update Notification
  33. Application Status Update Notification
  34. Architectural Plans was not accepted.
  35. Submitted by building department on applicant's behalf
  36. City of Lake City Utilities Notified.
  37. Application Status Update Notification
  38. Permit Issued

Contractors

  • Gary Thompson

    Thompson Custom Home Builders, Inc.

    License
    CRC046869
    Title
    Residential Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

  • Donald Hollingsworth Ii

    Holly Electric Inc

    License
    EC13012104
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Michael Faught

    Akins Heating And Air Conditioning Inc

    License
    CAC1813540
    Title
    Cert Class A A/c
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  1. Jul 15, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  2. Jul 15, 2026

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Jul 15, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Matt Forsyth

  4. Jul 15, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Jul 29, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Water Test Observed

    Inspected by Matt Forsyth

  6. Aug 10, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Gary Pitzer

  7. Aug 10, 2026

    Passed: Electrical - 1st Underground Rough–In

    Under Slab Pipe

    Inspected by Gary Pitzer

  8. Aug 10, 2026

    Passed: Building - Slab

    Inspected by Gary Pitzer

  9. Aug 21, 2026

    Release to power company

    Temp Power

    Inspected by Alaw

  10. Sep 30, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  11. Oct 1, 2026

    Passed: Building - Wall Sheathing

    No Windows Or Doors I Stalled

    Inspected by Gary Pitzer

Documents