Permit Details

Permit Search

Permit

Mobile Home

425 SW TREASURE LN
FORT WHITE, FL 32038

Permit #
000055959
Application #
76696
Status Completed
  1. Submitted Jun 24, 2026
  2. Issued Jun 24, 2026
  3. Expires Feb 6, 2027
  4. Completed Aug 11, 2026

Property

Parcel #
03785-001
Owner
Reid Dave, Reid Denise
Acres
10.02
Subdivision
Herlong Junction Unr
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
FFE TO BE 32" ABOVE ADJACENT GROUND FOR THE ENTIRE PERIMETER OF FOUNDATION
Requirement needed
By Final Inspection
Document needed is
Upload Photos
Document receieved
No
Fema map number
12023C0480C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
32
Length (Ft.In)
52
Driveway access to home:
Existing Drive
Installation Decal #
129784
Septic #
26-0473
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA10025617AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
4
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Submitted by building department on applicant's behalf
  5. Application Status Update Notification
  6. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • William Pringle

    Action Signs & Graphics Inc

    License
    EC13015190
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Jul 15, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Aug 7, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    Photos Sent

    Inspected by Matt Forsyth

  3. Aug 7, 2026

    Release to power company

    Inspected by Matt Forsyth

  4. Aug 7, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Aug 10, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    Ok To Issue Co

    Inspected by Karen Aiken-smoot