Roof Replacement or Repair
Permit
| Application #: | 76502 |
| Permit #: |
000055778 |
| Related Permit: |
|
| Submitted: | Friday, May 29, 2026 |
| Issued: | Monday, June 1, 2026 |
| Expires: | Monday, December 7, 2026 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0415C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
4600 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
29444.07–R3 |
| Product Manufacturer |
Integrity Metals |
| Product Description |
36" wide rib exposed fastener |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
Use Existing |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 5/27/2026 |
Application pending. |
| 5/29/2026 |
Application submitted by applicant. |
| 6/1/2026 |
Application Status Update Notification |
| 6/1/2026 |
Application submitted by applicant. |
| 6/1/2026 |
Application Status Update Notification |
| 6/1/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Lester Copeland Hogtown Roofing And Construction, Llc
|
CCC1336086 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - Roof Pictures Review |
|
Troy Crews |
6/9/2026 |
| Passed: Re-Roof - Roof Affidavit Review |
|
Troy Crews |
6/9/2026 |
| Passed: Re-Roof - In Progress |
In Future Call In Advance Roof Was Complete Gate Closed |
Troy Crews |
6/10/2026 |