| Passed: Plumbing/Gas - 1st Underground Rough–In |
Check Distance From Form Boards To Vertical Vent Pipe Distance 3/4 Inch |
Matt Forsyth |
4/27/2026 |
| Passed: Electrical - 1st Underground Rough–In |
Sleeve Coming Up Slab For Electrical Service |
Matt Forsyth |
4/29/2026 |
| Passed: Planning and Zoning Review - Elevation Confirmation |
Photos Uploaded And Ok |
Karen Aiken-smoot |
4/30/2026 |
| Passed: Electrical - Footer Steel & Grounding |
|
Matt Forsyth |
4/30/2026 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/30/2026 |
| Passed: Building - Monolithic Slab |
Monolithic Slab Built Up Minimum 12 Inches |
Matt Forsyth |
4/30/2026 |
| Passed: Building - Footer |
Porches |
Matt Forsyth |
5/7/2026 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
5/29/2026 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
5/29/2026 |
| Passed: Building - Framing |
Stud Pack For Porch Beam. Portel Holdown |
Matt Forsyth |
6/2/2026 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
6/10/2026 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Shower Base Set Only |
Matt Forsyth |
6/10/2026 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Portal Hold Downs Complete |
Matt Forsyth |
6/11/2026 |
| Passed: Building - Framing |
|
Matt Forsyth |
6/22/2026 |
| Passed: Building - Insulation |
Attic Access Rough In Observed, Walls And Ceiling Complete |
Matt Forsyth |
6/23/2026 |
| Cancelled: Electrical - Temporary Power Service |
|
Tcrews |
8/3/2026 |
| Passed: Electrical - Permanent Power |
Septic Needed |
Matt Forsyth |
8/6/2026 |
| Release to power company |
Rec'd Final Septic And Drive |
Ewilliams |
8/25/2026 |
| Septic Release Inspection |
|
Health Dept |
8/25/2026 |
| Passed: Building - Final |
*all Requirements Met To Release Co-- 9.28.26 Mg |
Matt Forsyth |
9/24/2026 |