Roof Replacement or Repair
Permit
| Application #: | 75911 |
| Permit #: |
000055466 |
| Related Permit: |
|
| Submitted: | Monday, April 13, 2026 |
| Issued: | Monday, April 13, 2026 |
| Expires: | Friday, May 15, 2026 |
| Completed: | Friday, May 15, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0320C |
| Type Roofing Job |
Overlay with Metal |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
1836 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Placing metal over Shingles |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL17992.1R4 |
| Product Manufacturer |
Captial Metal |
| Product Description |
metal |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| Ventilation: |
Off-ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 4/13/2026 |
Application pending. |
| 4/13/2026 |
Application submitted by applicant. |
| 4/13/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Harry D Anderson Jr Southeastern Coatings & Waterproofing, Inc.
|
CCC1326114 |
Roofing Contractor |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
|
Christian Allen |
4/21/2026 |
| Passed: Re-Roof - Roof Pictures Review |
|
Christian Allen |
5/14/2026 |
| Passed: Re-Roof - Roof Affidavit Review |
|
Christian Allen |
5/14/2026 |
| Passed: Re-Roof - Final |
|
Christian Allen |
5/15/2026 |