Permit Details

Permit Search

Permit

Mobile Home

558 SW BARNEY ST
HIGH SPRINGS, FL 32643

Permit #
000055451
Application #
75329
Status Completed
  1. Submitted Apr 6, 2026
  2. Issued Apr 9, 2026
  3. Expires Feb 27, 2027
  4. Completed Sep 1, 2026

Property

Parcel #
09961-003
Owner
Davis Kara N Mitchell,
Acres
4.98
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0513C
Mobile Home is a:
Double Wide
Year Built
1993
Width (Ft.In)
28.0
Length (Ft.In)
56.0
Driveway access to home:
Existing Drive
Installation Decal #
FLA522847.848
Septic #
26-0272
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
FLFLPZ97AB10917HP
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Flood Notice to Owner was not accepted.
  3. Flood Notice to Owner was not accepted.
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Submitted by building department on applicant's behalf
  10. Application Status Update Notification
  11. Permit Issued

Contractors

  • Bruce Mclay

    Mclay Mobile Homes

    License
    IH1025426
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Apr 2, 2026

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Christian Allen

  2. Apr 2, 2026

    Septic Release Inspection

    Inspected by Health Dept

  3. Aug 31, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Christian Allen

  4. Aug 31, 2026

    Release to power company

    Inspected by Christian Allen

  5. Aug 31, 2026

    Passed: Engineering - Setbacks

    Inspected by Christian Allen