Permit Details

Permit Search

Permit

New Residential Construction

1745 SW BETHLEHEM AVE
FORT WHITE, FL 32038

Permit #
000055436
Application #
74840
Status Completed
  1. Submitted Apr 6, 2026
  2. Issued Apr 8, 2026
  3. Expires Mar 10, 2027
  4. Completed Sep 21, 2026

Property

Parcel #
09954-008
Owner
Thiery Eric,
Acres
6.56
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
6" ABOVE PAVED ROAD - REVISED ON 9/14/2026 PER ENG LTR KAS
Requirement needed
By Nailing Inspection
Document needed is
Surveyor letter (FFE)
Document receieved
No
Fema map number
12023C0495C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1758
Total Area (Sqft)
2617
Building Height
9
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
26-0253
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Structural Engineering and Wind Load Calculations was not accepted.
  10. Structural Engineering and Wind Load Calculations was not accepted.
  11. Structural Engineering and Wind Load Calculations was not accepted.
  12. Structural Engineering and Wind Load Calculations was not accepted.
  13. Structural Engineering and Wind Load Calculations was not accepted.
  14. Structural Engineering and Wind Load Calculations was not accepted.
  15. Application Status Update Notification
  16. Application Status Update Notification
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. 911 Address Form was not accepted.
  20. Application Status Update Notification
  21. Application Status Update Notification
  22. Application Status Update Notification
  23. Application Status Update Notification
  24. Septic Approval Paperwork was not accepted.
  25. Application Status Update Notification
  26. Application Status Update Notification
  27. Application Status Update Notification
  28. Application Status Update Notification
  29. Submitted by building department on applicant's behalf
  30. Permit Issued
  31. Permit Status Update Notification

Contractors

  • Steven M Ayoub

    Ayoub Construction Corp

    License
    CBC1269058
    Title
    Cert. Building
    Role
    Contractor

    County License & Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Loren B Walbaum

    All-rite Heating & Air Conditioning,inc.

    License
    CMC1249660
    Title
    Mechanical Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Shawn Raba

    Done Right Roofing Inc.

    License
    CCC1333916
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Apr 15, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Christian Allen

  2. Apr 22, 2026

    Passed: Building - Footer

    Inspected by Christian Allen

  3. Apr 22, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Christian Allen

  4. Apr 22, 2026

    Passed: Engineering - Setbacks

    Inspected by Christian Allen

  5. May 11, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Christian Allen

  6. May 11, 2026

    Passed: Building - Wall Sheathing

    Inspected by Christian Allen

  7. May 11, 2026

    Passed: Building - Roof Decking

    Inspected by Christian Allen

  8. May 15, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Christian Allen

  9. May 27, 2026

    Cancelled: Electrical - 1st Underground Rough–In

    Roof Dry In Not Required, Window Screw Off Done With Framing Inspection

    Inspected by Tcrews

  10. May 28, 2026

    Passed: Building - Framing

    Partial For Window Screws

    Inspected by Troy Crews

  11. Jun 2, 2026

    Release to power company

    Re-sending The Release For Temp Power

    Inspected by Nanderson

  12. Jun 9, 2026

    Passed: Mechanical - Rough In

    Inspected by Christian Allen

  13. Jun 9, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Christian Allen

  14. Jun 9, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Christian Allen

  15. Jun 9, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Christian Allen

  16. Jun 15, 2026

    Passed: Building - Insulation

    Inspected by Christian Allen

  17. Aug 6, 2026

    Passed: Electrical - Permanent Power

    Pending Septic Final

    Inspected by Christian Allen

  18. Aug 31, 2026

    Release to power company

    Rec'd Septic Final

    Inspected by Ewilliams

  19. Aug 31, 2026

    Septic Release Inspection

    Inspected by Health Dept

  20. Sep 11, 2026

    Passed: Building - Final

    *blower Door Required Prior To Release Of Co-- 9.14.26 Mg

    Inspected by Christian Allen

Documents