Roof Replacement or Repair
Permit
| Application #: | 75738 |
| Permit #: |
000055419 |
| Related Permit: |
|
| Submitted: | Monday, March 30, 2026 |
| Issued: | Monday, April 6, 2026 |
| Expires: | Tuesday, May 26, 2026 |
| Completed: | Tuesday, May 26, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0379C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
5683 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
46297.1, 20767.1, 30310.1 |
| Product Manufacturer |
Veer Ultra, IKO DYNASTY |
| Product Description |
(FG) Full Peel and Stick (FL 46297.1) + 1 Layer Synthetic Veer Ultra (FL 20767.1) IKO DYNASTY FG (FL 30310.1) |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
Use Existing |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 3/30/2026 |
Application pending. |
| 3/30/2026 |
Application submitted by applicant. |
| 3/30/2026 |
Application Status Update Notification |
| 3/31/2026 |
Owner and Contractor Signature Page was not accepted. |
| 4/3/2026 |
Application submitted by applicant. |
| 4/6/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Robert Rozanski Erie Construction Mid-west Llc
|
CCC1336152 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
|
Matt Forsyth |
4/15/2026 |
| Failed: Re-Roof - Final |
No Affidavit Or Pictures Submitted |
Matt Forsyth |
5/18/2026 |
| Rescheduled 5/26/2026:Re-Roof - Roof Affidavit Review |
|
Tcrews |
5/22/2026 |
| Rescheduled 5/26/2026:Re-Roof - Roof Pictures Review |
|
Tcrews |
5/22/2026 |
| Passed: Re-Roof - Roof Affidavit Review |
|
Matt Forsyth |
5/26/2026 |
| Passed: Re-Roof - Roof Pictures Review |
|
Matt Forsyth |
5/26/2026 |
| Passed: Re-Roof - Final |
|
Christian Allen |
5/26/2026 |