Permit Details

Permit Search

Permit

Mobile Home

343 SW GALILEE LOOP
LAKE CITY, FL 32024

Permit #
000055409
Application #
75639
Status Completed
  1. Submitted Apr 1, 2026
  2. Issued Apr 1, 2026
  3. Expires Dec 14, 2026
  4. Completed Jul 1, 2026

Property

Parcel #
09462-008
Owner
Kerce John Matthew,
Acres
5.14
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0395C
Mobile Home is a:
Single Wide
Year Built
2026
Width (Ft.In)
16
Length (Ft.In)
76
Driveway access to home:
Private Driveway Permit
Septic #
26-0266
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA10025262
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Submitted by building department on applicant's behalf
  6. Failed to auto issue permit on credit card payment.
  7. Permit Issued

Contractors

  • David Albright

    David Albright Mobile Home Svc Llc

    License
    IH1129420
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Jun 17, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    *all Requirements Met To Release Power & Co-- 7.1.26 Mg

    Inspected by Troy Crews

  2. Jul 1, 2026

    Septic Release Inspection

    Inspected by Health Dept

  3. Jul 6, 2026

    Release to power company

    Inspected by Ewilliams

  4. Requested

    Engineering - Setbacks

    Awaiting inspection