Right-of-Way Access/Driveway
Permit
| Address |
122 NW DELANEY CT |
| Parcel #: |
02202-118 |
| Acres: | |
| Owner: | Karlton Matthew B, Karlton Lyndi M |
| Subdivision: | High Pointe |
| Zoning: | |
| Flood Zone: | |
| District: | |
| Application #: | 75661 |
| Permit #: |
000055332 |
| Related Permit: |
|
| Submitted: | Tuesday, March 24, 2026 |
| Issued: | Wednesday, March 25, 2026 |
| Expires: | Saturday, March 24, 2029 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Standards |
Driveway construction shall conform to the approved plan |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Driveway & Sidewalk |
| Type of construction of property |
Subdivision |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
4 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 3/24/2026 |
Application submitted by applicant. |
| 3/24/2026 |
Pending Public Works Application Approval |
| 3/25/2026 |
Application Approved by Public Works |
| 3/25/2026 |
Pending initial driveway inspection |
| 3/25/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
3/25/2026 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/25/2026 |