Permit Details

Permit Search

Permit

New Residential Construction

533 SW DYAL AVE
LAKE CITY, FL 32024

Permit #
000055297
Application #
74952
Status Permit Issued
  1. Submitted Mar 13, 2026
  2. Issued Mar 23, 2026
  3. Expires May 16, 2027
  4. Completed —

Property

Parcel #
03189-007
Owner
Thomas Ashley Johns, Thomas Adam Jackson
Acres
10.39
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
5

Permit

Status
Permit Issued
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
no less than 65.0’ (NAVD ’88 Datum) or 12 inches higher than HAG
Requirement needed
Slab Inspection
Document needed is
Upload Photos
Document receieved
No
Fema map number
12023C0380C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
3371
Total Area (Sqft)
5124
Building Height
35
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
26-0128
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application is within the City of Lake City service area
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Energy Code Forms was not accepted.
  9. Energy Code Forms was not accepted.
  10. Energy Code Forms was not accepted.
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Septic Approval Paperwork was not accepted.
  16. Application Status Update Notification
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. Submitted by building department on applicant's behalf
  20. City of Lake City Utilities Notified.
  21. Application Status Update Notification
  22. Application Status Update Notification
  23. Application Status Update Notification
  24. Permit Issued

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CGC1516042
    Title
    General Contractor
    Role
    Contractor
  • Ryan Felknor

    Felknor Electric, Inc.

    License
    EC13003153
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Subcontractor
  1. Mar 27, 2026

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Mar 27, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Matt Forsyth

  3. Mar 27, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Apr 21, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Pipe Only

    Inspected by Matt Forsyth

  5. Apr 21, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    2 Block High From Footers And Adjacent Grade

    Inspected by Karen Aiken-smoot

  6. Apr 29, 2026

    Passed: Building - Slab

    We Need Your Termite Spray Receipt. Please Forward This To Office With Permit Number . No Job Box That I Could Locate, Slab Is Ok With Wire Tied And Plastic In Place Taped

    Inspected by Gary Pitzer

  7. Jun 2, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Troy Crews

  8. Jun 10, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Jun 10, 2026

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  10. Jun 10, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  11. Jun 15, 2026

    Passed: Building - Framing

    Inspected by Matt Forsyth

  12. Jul 7, 2026

    Release to power company

    Inspected by Mgarber

  13. Aug 26, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Aug 26, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Aug 26, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  16. Aug 26, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  17. Sep 4, 2026

    Passed: Building - Insulation

    All Spray Foam Including Garage

    Inspected by Troy Crews

  18. Nov 17, 2026

    Passed: Electrical - Permanent Power

    Septic

    Inspected by Matt Forsyth

Documents