Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Electrical Service (DO NOT use for Generator Install) Permit

Address 332 SW FAB GLN
LAKE CITY, FL 32024
Parcel #: 03059-024
Acres: 7.45
Owner: Haire Adam, Haire Brianna
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 75606
Permit #: 000055276
Related Permit:
Submitted: Wednesday, March 18, 2026
Issued: Thursday, March 19, 2026
Expires: Monday, September 21, 2026
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0270C
What is the power service for? Existing Site Built Home
Other job details: Replace 200 amp service due to damaged bus bar and replace with new
Power Company Clay Electric
Septic # (00-0000) or (X00-000) X26
Electrical Code Edition 2020 National Electrical Code
Meter or Account: Meter
Meter or Account #: 154741149
Number of requested AMPS for electrical service: 200
Is the power service? Upgrading Existing Service
Residential or Commercial? Residential
Review Notes
3/18/2026 Application pending.
3/18/2026 Submitted by building department on applicant's behalf
3/18/2026 Application Status Update Notification
3/19/2026 Permit Issued
Contractors
Name/ Business License Title Role
Donald R Hollingsworth
Holly Electric Inc
EC13005429 Electrical Contractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Service Upgrade Final Matt Forsyth 3/25/2026
Release to power company Matt Forsyth 3/25/2026