Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address SW SILOAM ST
,
Parcel #: 00439-104
Acres: 0.00
Owner: Simpson Britnee A,
Subdivision: Siloam Crossing
Zoning:
Flood Zone:
District:
Application #: 75388
Permit #: 000055214
Related Permit:
Submitted: Tuesday, March 3, 2026
Issued: Wednesday, March 11, 2026
Expires: Saturday, March 10, 2029
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Finished floor requirement
Standards Shall conform to Public Works Determinations as stated below
Requirements An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status Permanent
Type of connection for access road Verify Existing Drive
Type of construction of property Mobile Home
If the type of construction is not listed, please describe below MOBILE HOME REPLACEMENT / SHARED DRIVEWAY
Normal vehicle usage: Automobiles
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 1
Is the access for commercial or residential use? Residential
County Road Type Paved
Review Notes
3/3/2026 Application submitted by applicant.
3/3/2026 Pending Public Works Application Approval
3/3/2026 Application Status Update Notification
3/3/2026 Application Approved by Public Works
3/6/2026 Pending initial driveway inspection
3/11/2026 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Verify Easement Requirements Chad Williams 3/3/2026
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 3/3/2026
Failed: Engineering - Verify existing driveway inspection Notes: This Driveway Needs A Pipe Extension From The Adjacent Parcel Any Further Questions Please Contact Chad Williams 386-623-2452. Smith, Blake 3/5/2026
Passed: Engineering - Initial Driveway inspection Notes: The County Doesn’t Have A Detail For A Pipe Extension. But Can Connect To Adjacent Parcel By Cutting Off Miterd End And Placing 18 Inch Corrugated Metal Pipe With Band 24 Feet Minimum Length With The Standard Concrete Mitered End With 4 Inches Limerock Minimal For Cover Smith, Blake 3/11/2026
Documents