Permit Details

Permit Search

Permit

Mobile Home

620 SW MARY TER
LAKE CITY, FL 32024

Permit #
000055202
Application #
75133
Status Completed
  1. Submitted Mar 6, 2026
  2. Issued Mar 10, 2026
  3. Expires Oct 26, 2026
  4. Completed May 4, 2026

Property

Parcel #
00459-218
Owner
Armstrong Wade Chancey, Long Michelle Marie
Acres
9.99
Subdivision
Timber Ridge Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0370C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
32
Length (Ft.In)
72
Driveway access to home:
Existing Drive
Installation Decal #
12752
Special temporary use permit number:
STU250906
Septic #
26-0177
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
LOHGA20041618AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
5
How many bathrooms does this home have?
3

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Submitted by building department on applicant's behalf
  7. Permit Issued

Contractors

  • Kyle Johnson

    Florida Mfg Foundations Llc

    License
    IH1126657
    Title
    Mh (dih) Dealer/installer
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Apr 28, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Apr 29, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  3. Apr 29, 2026

    Release to power company

    Inspected by Matt Forsyth

  4. Apr 29, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth