Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Remodel Permit

Address 193 SW GOPHER CT
FORT WHITE, FL 32038
Parcel #: 10013-030
Acres: 5.00
Owner: Stidham Terry R, Stidham Ira Dewayne
Subdivision: Columbia Acres
Zoning: A-3
Flood Zone: X
District: 4
Application #: 75332
Permit #: 000055182
Related Permit:
Submitted: Friday, February 27, 2026
Issued: Friday, March 6, 2026
Expires: Monday, March 16, 2026
Completed: Monday, March 16, 2026
Status: Completed
Septic Release? No
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0495C
Type of Structure House
Commercial or Residential? Residential
Description of the work being performed: Alteration: Remove existing tub and replace with jetted tub. No tile or drywall work required. Tub butts up to existing tile. New tub connects to existing drain and water connections. Install one dedicated 20 amp GFCI circuit. NO CHANGE TO EXISTING FLOOR PLAN
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Service Amps 20
Review Notes
2/27/2026 Application pending.
2/27/2026 Application submitted by applicant.
3/5/2026 Application Status Update Notification
3/6/2026 Permit Issued
Contractors
Name/ Business License Title Role
Joel Casimiro
All State Plumbing Services Inc
CFC057323 Cert. Plumbing Contractor
Donald E Willis
Willis Electric, Inc.
EC13007259 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 2nd Rough-In Christian Allen 3/16/2026
Passed: Building - Final Christian Allen 3/16/2026