Permit Details

Permit Search

Permit

Storage Building

164 NE CORAL DR
LAKE CITY, FL 32055

Permit #
000055180
Application #
74783
Status Completed
  1. Submitted Jan 28, 2026
  2. Issued Mar 6, 2026
  3. Expires Nov 11, 2026
  4. Completed May 15, 2026

Property

Parcel #
04838-132
Owner
Kirsch Properties,
Acres
10.14
Subdivision
Osceola Plantations Unr
Zoning
A-3
Flood zone
A
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
29 flood vents to be 12" or less above Finished Floor or adjacent grade Non-Habitable Structure
Requirement needed
By Final Inspection
Document needed is
Elevation Certificate
Document receieved
Yes
Fema map number
12023C0215D
Type of Structure
Storage Building
Commercial or Residential?
Commercial
Total Area (Sqft)
7200
Septic# (00-0000) or (X00-000)
26-0091
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
10' (accessory)
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
non-habitable structure
Dev Permit #
FDP2026-006
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height
22
Building Length
120
Building Width
60
Service Amps
100
Slab
None
Mechanical
No
Electrical
No
Plumbing
No

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Submitted by building department on applicant's behalf
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Jan 27, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Mar 20, 2026

    Passed: Building - Footer

    Be Reminded Of Flood Vents Which Will Be Required

    Inspected by Troy Crews

  3. May 11, 2026

    Failed: Building - Final

    Property Must Be Graded For Positive Drainage Away From The Building Flood Vents Must Be Engineered Or Signed Off By An Engineer Letter

    Inspected by Troy Crews

  4. May 15, 2026

    Passed: Building - Final

    Inspected by Troy Crews