Permit Details

Permit Search

Permit

New Residential Construction

3431 SW CUSTOM MADE CIR
LAKE CITY, FL 32024

Permit #
000055125
Application #
75183
Status Completed
  1. Submitted Feb 23, 2026
  2. Issued Feb 27, 2026
  3. Expires Jan 4, 2027
  4. Completed Jul 14, 2026

Property

Parcel #
09280-102
Owner
Haskew Jon L, Haskew Kimberly J
Acres
4.51
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
93'
Requirement needed
By Nailing Inspection
Document needed is
NA
Document receieved
No
Fema map number
12023C0395C
This is the construction of a
Other
Setbacks Front
25'
Setback Side 1
15'
Setback Side 2
15'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
690
Total Area (Sqft)
840
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0826
If Other, explain the use of the structure.
Pool House
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Architectural Plans was not accepted.
  4. Submitted by building department on applicant's behalf
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Donald Hollingsworth Ii

    Holly Electric Inc

    License
    EC13012104
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Feb 17, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Mar 9, 2026

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Mar 9, 2026

    Passed: Building - Footer

    2#5 Rebar On Chairs And Wired

    Inspected by Gary Pitzer

  4. Mar 9, 2026

    Cancelled: Building - Monolithic Slab

    Inspected by Gpitzer

  5. Mar 9, 2026

    Cancelled: Engineering - Setbacks

    Inspected by Gpitzer

  6. Mar 24, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv, No Water, No Clean Out, Pool House Area

    Inspected by Gary Pitzer

  7. Mar 31, 2026

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  8. Mar 31, 2026

    Passed: Building - Monolithic Slab

    Pool House, 2.#5 Rebar On Chairs And Wired, Plastic And Tape

    Inspected by Gary Pitzer

  9. Apr 21, 2026

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  10. Apr 21, 2026

    Passed: Building - Wall Sheathing

    Pool House

    Inspected by Gary Pitzer

  11. Apr 29, 2026

    Passed: Building - Framing

    Inspected by Gary Pitzer

  12. Apr 29, 2026

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  13. Apr 29, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  14. Apr 29, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  15. May 6, 2026

    Passed: Building - Insulation

    Exterior Walls And Roof Are Foam, Also Batting On Interior Wall

    Inspected by Gary Pitzer

  16. Jul 8, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 7.14.26 Mg

    Inspected by Troy Crews