Permit Details

Permit Search

Permit

Mobile Home

657 SW FINLEY LITTLE LANE
,

Permit #
000055121
Application #
74978
Status Completed
  1. Submitted Feb 26, 2026
  2. Issued Feb 26, 2026
  3. Expires Sep 26, 2026
  4. Completed Apr 7, 2026

Property

Parcel #
09130-013
Owner
Davis Christa,
Acres
5.01
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
NA
Fema map number
12023C0383D
Mobile Home is a:
Triple Wide
Year Built
2024
Width (Ft.In)
45
Length (Ft.In)
76
Driveway access to home:
Private Driveway Permit
Installation Decal #
116798
Septic #
26-0117
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA30074191ABC
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
4
How many bathrooms does this home have?
3

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Submitted by building department on applicant's behalf
  8. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • William Pringle

    Action Signs & Graphics Inc

    License
    EC13015190
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Mar 30, 2026

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Mar 30, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    All Requirements Met To Release Co-- 4.7.26 Mg

    Inspected by Gary Pitzer

  3. Apr 2, 2026

    Septic Release Inspection

    Inspected by Health Dept

  4. Apr 7, 2026

    Release to power company

    Inspected by Ewilliams