| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv Only, No Clean Out |
Gary Pitzer |
2/26/2026 |
| Passed: Building - Footer |
Install Ufer Ground Prior To Pour |
Troy Crews |
3/5/2026 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
3/5/2026 |
| Passed: Electrical - Footer Steel & Grounding |
Need To Install Prior To Concrete Placement |
Troy Crews |
3/5/2026 |
| Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
3/5/2026 |
| Passed: Building - Slab |
|
Troy Crews |
3/5/2026 |
| Passed: Building - Roof Decking |
Roof Deck Only For Dry In Before Rain |
Gary Pitzer |
4/9/2026 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
4/21/2026 |
| Failed: Building - Wall Sheathing |
There Is A Large Precentage Of The Sheithing Nails That Are Driven To Deep Into The Material It Is Holding. This Will Compromise The Strenght Of The Walls |
Gary Pitzer |
4/21/2026 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Renailed |
Gary Pitzer |
4/24/2026 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Preasured Up, No Tub Or Shower Pans Installed |
Gary Pitzer |
5/8/2026 |
| Failed: Mechanical - Rough In |
We Will Finish Mechanical Inspection When Fireplace Is Installed, Ok To Insulate, Also We Will Need To See The Windows And Exterior Doors Screwed In Place Before The Exterior Coverings Are Installed. Please Try To Schedule This With Your Insulation Inspection
|
Gary Pitzer |
5/8/2026 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/8/2026 |
| Passed: Mechanical - Rough In |
Chimney Pipe And Fire Collars Have Been Installed |
Troy Crews |
5/14/2026 |
| Passed: Building - Window Attachment |
Windows Have Been Screwed Off |
Troy Crews |
5/14/2026 |
| Passed: Building - Strapping |
|
Troy Crews |
5/14/2026 |
| Passed: Building - Framing |
|
Troy Crews |
5/14/2026 |
| Passed: Building - Insulation |
|
Troy Crews |
5/26/2026 |