Permit Details

Permit Search

Permit

New Residential Construction

547 NW LONA LOOP
LAKE CITY, FL 32055

Permit #
000055007
Application #
74569
Status Completed
  1. Submitted Jan 20, 2026
  2. Issued Feb 12, 2026
  3. Expires Mar 16, 2027
  4. Completed Sep 21, 2026

Property

Parcel #
02391-010
Owner
Jackson Foye Brack, Jackson Kelly G
Acres
2.23
Subdivision
Fairfield Woods
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Engineered letter provided for slope of parcel NA
Fema map number
12023C0280D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1667
Total Area (Sqft)
1987
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0964
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Subcontractor Form was not accepted.
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Application Status Update Notification
  16. Application Status Update Notification
  17. Submitted by building department on applicant's behalf
  18. Application Status Update Notification
  19. Application Status Update Notification
  20. Application Status Update Notification
  21. Application Status Update Notification
  22. Application Status Update Notification
  23. Application Status Update Notification
  24. Application Status Update Notification
  25. Permit Issued
  26. Architectural Plans was not accepted.

Contractors

  • Mark J Mashburn

    Americas Home Place Inc

    License
    CRC1330787
    Title
    Residential Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

  • Joseph H Strada Jr

    Strada Services Inc Dba Strada Electric & Security

    License
    EC13003715
    Title
    Cert Electrical
    Role
    Subcontractor

    Liability Insurance & Workers Comp Expired.

  • Tyler Stratton

    Stratton Plumbing

    License
    CFC1432618
    Title
    Cert. Plumbing
    Role
    Subcontractor
  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Joseph H Strada Jr

    Strada Services Inc

    License
    CAC043953
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    Liability Insurance & Workers Comp & Employees Workers Comp Expired.

Inspections

  1. Feb 25, 2026

    Passed: Building - Footer

    Next Inspection Bond Beam 56 Inches #5 Rebar

    Inspected by Matt Forsyth

  2. Feb 25, 2026

    Passed: Electrical - Footer Steel & Grounding

    Next Inspection Bond Beam 56"

    Inspected by Matt Forsyth

  3. Mar 31, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  4. Apr 9, 2026

    Failed: Building - Vertical Cells/Columns

    Wall Construction R606.3.2 R606.3.5.2

    Inspected by Matt Forsyth

  5. Apr 14, 2026

    Passed: Building - Footer

    Block Wall Inspection Ok To Grout

    Inspected by Matt Forsyth

  6. Apr 14, 2026

    Passed: Electrical - Footer Steel & Grounding

    Vertical Steel

    Inspected by Matt Forsyth

  7. Apr 27, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  8. Apr 27, 2026

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  9. Apr 29, 2026

    Failed: Building - Slab

    No Perimeter Bar #5 Check Interior Footings How You Doing

    Inspected by Matt Forsyth

  10. Apr 30, 2026

    Passed: Building - Slab

    All Rebar In Place And Chaired Up

    Inspected by Matt Forsyth

  11. May 1, 2026

    Release to power company

    Inspected by Mforsyth

  12. May 1, 2026

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.

  13. May 12, 2026

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  14. May 12, 2026

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  15. May 12, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  16. Jun 9, 2026

    Failed: Building - Framing

    Floor Heights From Grade Don't Match Engineer Letter, Header Strapping Or Simpson Screws Missing At Back Door And Surrounding Windows

    Inspected by Troy Crews

  17. Jun 9, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  18. Jun 9, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  19. Jun 9, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Troy Crews

  20. Jun 9, 2026

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  21. Jun 11, 2026

    Passed: Building - Framing

    Simpson Screws Have Been Added To Headers And King Studs Still Correction On Elevation Engineer Letter

    Inspected by Troy Crews

  22. Jun 15, 2026

    Passed: Building - Insulation

    Inspected by Troy Crews

  23. Jul 22, 2026

    Passed: Electrical - Permanent Power

    Need Final Septic

    Inspected by Troy Crews

  24. Sep 15, 2026

    Passed: Engineering - Setbacks

    Per Zoning: We Need A Copy Of The Digitally Sealed Engineer Letter

    Inspected by Matt Forsyth

  25. Sep 15, 2026

    Failed: Building - Final

    Need Final Septic Document House, Passed Final Inspection

    Inspected by Matt Forsyth

  26. Sep 15, 2026

    Septic Release Inspection

    Inspected by Health Dept

  27. Sep 17, 2026

    Passed: Building - Final

    *blower Door Required Prior To Release Of Co-- 9.18.26 Mg

    Inspected by Matt Forsyth

  28. Sep 17, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  29. Sep 21, 2026

    Release to power company

    Inspected by Ewilliams

  30. Sep 21, 2026

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.