| Passed: Fire - Plan Review |
|
Cpt. Shane Overstreet |
12/15/2025 |
| Cancelled: Building - Monolithic Slab |
|
Callen |
2/18/2026 |
| Passed: Engineering - Setbacks |
|
Christian Allen |
2/18/2026 |
| Passed: Electrical - Footer Steel & Grounding |
Footers For Piers Throughout Main Office |
Christian Allen |
2/18/2026 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
2/26/2026 |
| Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
3/2/2026 |
| Passed: Building - Monolithic Slab |
|
Christian Allen |
3/6/2026 |
| Passed: Engineering - Setbacks |
|
Christian Allen |
3/6/2026 |
| Passed: Electrical - Footer Steel & Grounding |
|
Christian Allen |
3/6/2026 |
| Rescheduled 4/6/2026:Building - Framing |
|
Ewilliams |
4/6/2026 |
| Passed: Building - Framing |
Steel Framing Only Front Office Building Rear Building Not Complete At This Time |
Troy Crews |
4/6/2026 |
| Passed: Building - Framing |
Main Iron Frame And Mezzanine Deck |
Troy Crews |
4/14/2026 |
| Passed: Building - Spot Check |
Spot Check On Framing And Bathrooms |
Troy Crews |
5/18/2026 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/1/2026 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/1/2026 |
| Passed: Mechanical - Rough In |
Need To See Bath Fan Ducts On Open Ceiling Inspection |
Troy Crews |
6/1/2026 |
| Passed: Building - Insulation |
Roof Only Need To Do Wall Insulation Inspection Prior To Sheetrock |
Troy Crews |
6/1/2026 |
| Passed: Electrical - Permanent Power |
Need Septic Final And Final Release From Dot On Driveway For Power Release |
Troy Crews |
6/25/2026 |
| Cancelled: Electrical - Temporary Power Service |
|
Tcrews |
6/25/2026 |
| Cancelled: Electrical - 1st Underground Rough–In |
|
Tcrews |
6/25/2026 |
| (Requested) Fire-Plan Review |
|
|
|