Permit Details

Permit Search

Permit

Mobile Home

503 SE HOPEFUL DR
LAKE CITY, FL 32025

Permit #
000054941
Application #
74857
Status Completed
  1. Submitted Jan 28, 2026
  2. Issued Feb 3, 2026
  3. Expires Nov 23, 2026
  4. Completed May 29, 2026

Property

Parcel #
09030-053
Owner
Amber Cothran & Shane Dowd
Acres
1.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0405C
Mobile Home is a:
Double Wide
Year Built
1998
Width (Ft.In)
28
Length (Ft.In)
66
Driveway access to home:
Existing Drive
Installation Decal #
121474
Septic #
26-0102
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
PH11AL0860AB
Wind Zone?
3
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
2
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application submitted by applicant.
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Permit Issued
  10. Permit Status Update Notification

Contractors

  • Manuel M Brannan

    Mikes Mobile Setup Llc

    License
    IH1025396
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jan 23, 2026

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Christian Allen

  2. Jan 28, 2026

    Septic Release Inspection

    Inspected by Health Dept

  3. Apr 7, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    *inspector Completed Spot Check 5.27.26 To Confirm Old Mh Has Been Removed, All Requirements Met To Release Co-- 5.29.26 Mg *appears To Meet Elevation Requirements

    Inspected by Christian Allen

  4. Apr 7, 2026

    Release to power company

    Inspected by Christian Allen

  5. Apr 7, 2026

    Passed: Engineering - Setbacks

    Inspected by Christian Allen

  6. May 27, 2026

    Passed: Building - Spot Check

    Old Home Removed

    Inspected by Christian Allen