Right-of-Way Access/Driveway
Permit
| Address |
, |
| Parcel #: |
02161-010 |
| Acres: | 0.75 |
| Owner: | Norman Samuel, Norman Tonya |
| Subdivision: | |
| Zoning: | A-3 |
| Flood Zone: | X |
| District: | 3 |
| Application #: | 74477 |
| Permit #: |
000054909 |
| Related Permit: |
Mobile Home: 000055076 |
| Submitted: | Wednesday, January 7, 2026 |
| Issued: | Friday, January 30, 2026 |
| Expires: | Friday, April 10, 2026 |
| Completed: | Friday, April 10, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0280D |
| Standards |
Driveway construction shall conform to the approved plan |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 12/13/2025 |
Email confirmation reminder sent. |
| 12/27/2025 |
Email confirmation reminder sent. |
| 1/7/2026 |
Application submitted by applicant. |
| 1/7/2026 |
Pending Public Works Application Approval |
| 1/8/2026 |
Application Approved by Public Works |
| 1/8/2026 |
Pending initial driveway inspection |
| 1/30/2026 |
Permit Issued |
| 2/20/2026 |
New address issued and ticket completed. |
Contractors
| Name / Business |
License |
Title |
Role |
David Albright David Albright Mobile Home Svc Llc
|
IH1129420 |
Mh Installer (ih) |
Contractor |
Michael Boland Ace A/c Of Ocala Llc
|
ES12000926 |
Cert. Electrical Specialty |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
1/8/2026 |
| Passed: Engineering - Initial Driveway |
inspection Notes: Applicant Revised Location Of Driveway To The West End Of Property. |
Beach, Garrett |
1/30/2026 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/10/2026 |