Passed: Mobile Home - Mobile Home Set-Up Final
*final Septic Release Required Prior To Release Of Power, Surveyor Letter Or Meet Inspector Onsite With Transit Required To Confirm Mfe Is Met Due To Inability To Confirm.-- 4.2.26 Mg
*elevation Couldn't Be Verified. Home Is To Far Off Road-- Ca
Inspected by Christian Allen