Permit Details

Permit Search

Permit

Roof Replacement or Repair

184 SE HANOVER PL
LAKE CITY, FL 32025

Permit #
000054726
Application #
74653
Status Completed
  1. Submitted Dec 23, 2025
  2. Issued Dec 24, 2025
  3. Expires Jul 15, 2026
  4. Completed Jan 16, 2026

Property

Parcel #
08360-065
Owner
Hanover Place Llc,
Acres
0.33
Subdivision
Village Wood Unit 3
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0313D
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
We are installing 29 ga galvalume metal over all 4 of the apartments in this unit (apts 101-104).
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2432
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Metal over existing shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL13768.1-R4
Product Manufacturer
Agri-Metal Supply
Product Description
29 GA Tuff Rib Roof Panel
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
Existing roof will act as the sealed roof deck.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Application submitted by applicant.
  5. Application Status Update Notification
  6. Permit Issued

Contractors

  • Roger D Whiddon

    Whiddon Construction Co Inc

    License
    CCC1330273
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Jan 8, 2026

    Passed: Re-Roof - In Progress

    Inspected by Christian Allen

  2. Jan 15, 2026

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Christian Allen

  3. Jan 15, 2026

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Christian Allen

  4. Jan 16, 2026

    Passed: Re-Roof - Final

    Inspected by Troy Crews