Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 188 SE FAYE LN
LAKE CITY, FL 32025
Parcel #: 07570-080
Acres: 0.48
Owner: Clifton Kari,
Subdivision: Suzanne Unit 3
Zoning: RSF-2
Flood Zone: X
District: 4
Application #: 73973
Permit #: 000054717
Related Permit:
Submitted: Friday, October 24, 2025
Issued: Friday, December 19, 2025
Expires: Friday, January 23, 2026
Completed: Friday, January 23, 2026
Status: Completed
Septic Release? Yes
Notes:
*MFE = BOTTOM OF LOWEST BEAM MUST BE 1' ABOVE THE ROAD *FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER AND CO
LAKE CITY UTLITY CUSTOMER SERVICE NOTES 12/03/25 The City of Lake City provides water to this location. A utility account must be established to access water. Please contact Tapscs@lcfla.com for assistance. Your plumber will need to contact Growth Management to submit a utility connection permit. The permit technicians can assist you with any questions you may have regarding the permitting process. Ms. Ivy Stockstill can be reached at (386)719-5750 or francoi@lcfla.com or Ms. Kiana Williams can be reached at 386-719-5751 or williamsk@lcfla.com. Once the plumbing is connected to the water meter and sewer tap, a city utility inspector must inspect the connection before covering the connection points. Please call to schedule an appointment for the inspection and initial turn-on. If the request is received before 1 pm, the appointment can be made for the same day. Any requests received after 1 pm would be scheduled for the next business day. Locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Bottom of lowest beam must be one foot above the road
Fema map number 12023C0311D
Mobile Home is a: Single Wide
Year Built 1995
Width (Ft.In) 14
Length (Ft.In) 66
Driveway access to home: Existing Drive
Installation Decal # 124357
Septic # 25-0794
Setbacks Front 25'
Setback Side 1 10'
Setbacks Rear 15'
Setback Side 2 10'
Are you applying for a 5 year temporary permit? No
Serial # H109700G
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 2
How many bathrooms does this home have? 2
Review Notes
10/24/2025 Application pending.
10/24/2025 City of Lake City Utilities Notified.
10/24/2025 Point Review - Pre-submittal Review Notes
11/4/2025 Application submitted by applicant.
11/13/2025 Application Status Update Notification
11/16/2025 Application Status Update Notification
11/17/2025 Application Status Update Notification
11/17/2025 Application Status Update Notification
11/21/2025 Application Status Update Notification
11/25/2025 Application Status Update Notification
12/3/2025 Application Status Update Notification
12/4/2025 Application Status Update Notification
12/12/2025 Application Status Update Notification
12/12/2025 Application submitted by applicant.
12/12/2025 Application Status Update Notification
12/16/2025 Application Status Update Notification
12/16/2025 Application submitted by applicant.
12/17/2025 Application Status Update Notification
12/19/2025 Application Status Update Notification
12/19/2025 Permit Issued
Contractors
Name/ Business License Title Role
Richard Rayborn
Sams Mobile Home Service
IH1025436-1 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 11/25/2025
Passed: Engineering - Setbacks Appears To Meet Setbacks, No Markers Gary Pitzer 12/9/2025
Failed: Mobile Home - Mobile Home Set-Up Final Manufactured Home Needs To Be Completely Set Up With Utilities Hooked Up, Bocking And The Downs Installed Gary Pitzer 12/9/2025
Passed: Mobile Home - In County Pre-Mobile Home before set-up Christian Allen 12/12/2025
Failed: Mobile Home - Mobile Home Set-Up Final Siding Must Be Installed To Complete Thermal Envelope Of Home At Time Of Final Inspection Christian Allen 1/12/2026
Passed: Engineering - Setbacks Christian Allen 1/12/2026
Failed: Mobile Home - Mobile Home Set-Up Final Need Surge Protector In Main Outside Panel Troy Crews 1/21/2026
Failed: Engineering - Setbacks Need To String E Property Line To Confirm 10 Foot Set Back Troy Crews 1/21/2026
Passed: Mobile Home - Mobile Home Set-Up Final Troy Crews 1/23/2026
Release to power company Troy Crews 1/23/2026
Passed: Engineering - Setbacks Owner Strung E Property Line Has 11 Foot Set Back Troy Crews 1/23/2026
Submitted Power Release through FPL Portal Ward, Emaleigh C. 1/23/2026