Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address SE ROGERS DR
,
Parcel #: 09358-004
Acres: 0.00
Owner: Rodrigue Steven A Revocable Trust Agreement Dated April 16, 2015,
Subdivision:
Zoning:
Flood Zone:
District:
Application #: 74574
Permit #: 000054714
Related Permit:
Submitted: Monday, December 15, 2025
Issued: Friday, December 19, 2025
Expires: Saturday, March 10, 2029
Completed:
Status: Pending initial driveway inspection
Septic Release? na
Notes:
MAKING ANOTHER ACCESS IN AND OUT FOR EASIER ACCESS OF DELIVERY VEHICLES AND OWNER VEHICLES AS WE HAVE TIGHT ACCESS INTO THE ONE DRIVEWAY. THEREFORE, WOULD LIKE TO PUT IN ANOTHER CULVERT FOR ROAD ACCESS, AND COMPLETE A "CIRCLE DRIVEWAY"
Job Details
Finished floor requirement
Standards Driveway construction shall conform to the approved plan
Requirements An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status Permanent
Type of connection for access road Verify Existing Drive
Type of construction of property Other
If the type of construction is not listed, please describe below using existing driveway, continue existing driveway to enter or exist another spot with another culvert
Normal vehicle usage: Automobiles;Trucks
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 5
Is the access for commercial or residential use? Residential
County Road Type Unpaved
Review Notes
12/15/2025 Application submitted by applicant.
12/15/2025 Pending Public Works Application Approval
12/18/2025 Application Approved by Public Works
12/19/2025 Permit Issued
3/10/2026 Pending initial driveway inspection
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 12/16/2025
Passed: Engineering - Verify existing driveway Smith, Blake 12/19/2025
Passed: Engineering - Initial Driveway Beach, Garrett 2/6/2026
Passed: Engineering - Initial Driveway Smith, Blake 3/11/2026
Documents
File Name Date File Size
Img_0013.jpeg 2026.02.06 9.63MB
Image.jpg 2025.12.22 2.97MB
Original Permit 20251219.pdf 2025.12.22 29.00kB
Inspections Checklist.pdf 2025.12.22 101.51kB
Driveway_application_drawing.jpg 2025.12.17 105.40kB
Application.pdf 2025.12.17 32.39kB